There is provision to install Solar Farm (Park) promulgated by state in solar energy policy 2013. Under the above-mentioned provision in the state in solar energy policy solar farm (park) where several grid connection based on solar electricity production plant capacity can be varied, with electric drainage infrastructure system is proposed to be developed.
Under the solar park project of the Government of India 600 MW solar park will be developed in the state. Installation of total 600 MW solar park will be done in Jalaun, Etah, Mirzapur, Allahabad and Jhansi district. Development and management of solar parks is designated to state agency which is UPNEDA and shall be made by the joint venture with nodal agency Solar Energy Corporation of India (SECI) of the Government of India. The percentage of share would be 50-50 in the joint venture of UPNEDA and SECI . Under the scheme of the Government of India for developing solar park Rs. 20.00 Lack per MW or 30 percent of the amount of the project, which ever would be less is available.
In addition to the proposed land development in solar park established evacuation of electricity produced by Solar Power Plant all the infrastructure arrangements will be available. For setting up solar park project VGF (Viability Gap Funding) based bidding will be made.